top of page

INSULATION AND 

CLADDING

Project Name: Fairmont Abu Dhabi

Client: The National Investment Corporation (NIC)

Contractor (MEP): Drake & Scull Engineering LLC

Status: Ongoing

 

Scope of Work: Fabrication and Installation Work of Aluminum Cladding of CHW Pipe and HVAC Duct (with all accessories, flange boxes, valves boxes and

removable covers).

​

​

Project Name: Fish Market - Chilled Water Network

Client: EMPOWER

Main Contractor: Steel Construction Engineering Co. L.L.C

Status: Completed

 

Scope of Work: Fabrication and Installation of Cladding for the Chilled Water Network Valve chambers.

​

 

Project Name: Fountain View Tower (boulevard Tower)

Client: EMAAR

Main Contractor: Al Shafar General Contracting

Status: Completed

 

Scope of Work: Fabrication and Installation Work of Aluminum Cladding of CHW Pipe and HVAC Duct (with all accessories, flange boxes, valves boxes and

removable covers).​​

​

Project Name: Fabrication and Installation of Cladding Works at Gate Houses- Abu Dhabi Airport

Client: Abu Dhabi Airport Company PJSC

Contractor: PCE Joint Venture

Status: Completed

 

Scope of Work:

GI DUCT Wrapping: Fabrication and application of self-adhesive aluminum foil wrapping on ducting system and confined CHW piping works.

 

Aluminum Cladding: Fabrication and application of self-adhesive aluminum foil wrapping on ducting system and confined CHW

piping works.

​

Project Name: Fountain View Towers

Client: EMAAR

Main Contractor: Arabian Construction Company

Status: Completed

 

Scope of Work: Supply, Fabrication and Installation Work of Aluminum Cladding of CHW Pipe and HVAC Duct (with all accessories, flange boxes, valves boxes and

removable covers).

​

Project Name: Insulation and Cladding of CWN at JVC Network

Client: EMPOWER

Main Contractor: Steel Construction Engineering Co.

Status: Completed

 

Scope of Work: Fabrication and Installation work of Insulation and cladding for CHW Pipes.

​

Project Name: Masdar Institute Neighborhood

Housing – Abu Dhabi 

Client: Masdar

Contractor: JAMES L WILLIAMS MIDDLE EAST

Status: Ongoing

​

Scope of Work: Supply, storing, shifting to the Work Location, fabrication and applying of Aluminum cladding works for chilled water pipes and HVAC ducts

​

Project Name: MEP/EXPO 2020-MOBILITY/HVAC/195 

Client: EXPO 2020

Contractor: ALFUTTAIM ENGINEERING L.L.C

Status: Completed

 

Scope of Work: Supply, storing, shifting to the Work Location, fabrication and applying of Aluminum cladding works for chilled water pipes and HVAC ducts.

​

Project Name: ONE ZA’ABEEL, PACKAGE B (TOWER B)

Client: One Za’abeel LLC

MEP Contractor: SPECON LLC

Status: On-Going

​

Project Name: Mid-Field Terminal Project, Abu Dhabi

Client: Abu Dhabi Airport

Main Contractor: Trojan General Contracting

MEP Contractor: BK Gulf

Status: Completed

 

Scope of Work: Ducting & Piping Fabrication & Installation of Aluminium Cladding Works

Project Name: ICD Brookfield Place, Plot GB 03, DIFC,

Dubai, UAE

Client: Brookfield Properties

Contractor: JAMES L WILLIAMS MIDDLE EAST

Status: Completed

 

Scope of Work: Supply, delivery, shifting to the work location & applying of acoustic insulation for HVAC ducts & HVAC Equipment’s in Podium level.

​

Project Name: MIDFIELD TERMINAL BUILDING, ABU DHABI INTERNATIONAL AIRPORT, FABRICATION AND INSTALLATION OF ALIMINIUM CLADDING WORK- PUMP ROOMS£ 335 AND # 260 OF PIER 2 

Client: Abu Dhabi Airport Company PJSC

Contractor: PCE Joint Venture

Status: Completed

 

Scope of Work: Fabrication and installation of aluminum cladding for duct work, cold water and chilled water pipes in the pump rooms.

​

Project Name: HVAC Ducting System and CHW piping cladding fabrication and installation works @ Atlantis Expansion Project

Main Contractor: BESIX Construction Company

MEP Contractor: Specon L.L.C

Status: Ongoing

 

Scope of Work: Complete supply and installation cladding works including measurement, cutting, surface preparation, riveting, all as per the received RFQ for the specified chilled water pipes and ducts in the above project.

​

Project Name: HVAC Ducting and Chilled water piping cladding fabrication and installation works @ Dubai Hills Mall

Client: EMAAR

Main Contractor: ALEC ENGINEERING AND CONTRACTING LLC

Status: Ongoing

 

Scope of Work: Complete cladding works including measurement, cutting, surface preparation, riveting, all as per standard specs. including supply of consumables such as rivets, silicon, hinges, for all CHW pipes and ducts at the mall roof as per the drawing, specs. and site requirements.

​

Project Name: HVAC Ducting System and CHW piping cladding fabrication and installation works @PLOT 19-CREEK DUBAI

Client: EMAAR

MEP Contractor: EFECO L.L.C

Status: Ongoing

 

Scope of Work: supply and installation cladding works including measurement, cutting, surface preparation, riveting, all as per the received RFQ drawings, specs and BOQ for the specified chilled water pipes and ducts as per the drawing received.

​

Project Name: ONE ZA’ABEEL, DUBAI (TOWER A) 

Client: ICD

Main Contractor: ALEC ENGINEERING AND CONTRACTING LLC

MEP Contractor: ALEMCO Electromechanical Contracting L.L.C.

Status: Ongoing

Scope of Work: HVAC Ducting and CHW Piping Cladding Supply, Fabrication and Installation Work

​

Project Name: OPERA Grand Tower cladding

Client: EMAAR

MEP Contractor: Reliance Contracting Company W.L.L                                      

Status: Ongoing

Scope of Work: Supply, Fabrication & Installation of Aluminium Cladding for Duct and chilled water piping.

bottom of page